Sunday, April 28, 2013

Weeks 3 and 4


Week 3 and Week 4


  • The initial design including the air pump was discarded for an alternative design that is more compact. The new design involves a helical path for the water to flow through, maintaining the necessary length of path while making the container itself more compact.
Current design with helical path

  • All necessary supplies were accumulated including:
    • 8 feet of plastic tubing with 1/4 inch diameter
    • 10 feet of PVC piping with 1/2 inch diameter
    • funnel with 1/4 inch diameter
    • 3110.5 grams of sand
    • a two liter bottle 
    • 5.6-6.0 grams of iron filings
    • a cup of gravel
    • Schuylkill River water with an initial turbidity reading of 5.92 NTU 
    • H2 Hold Epoxy
Funnel with 1/4 inch diameter

Gravel
PVC with 1/2 inch diameter

Sand

Schuylkill River Water

Epoxy

Plastic tubing with 1/4 inch diameter

Iron Filings

  • Week 3 team members went to 10th Street Hardware, where the plastic tubing, PVC, funnel, and epoxy were acquired. Between materials and subway tokens, each member contributed roughly 7 dollars to the materials. 

  • Week 4 class included going to the river to collect water in the 5 gallon drum along with going to the soil lab to collect the sand, gravel, and iron filings. The turbidity level was also determined in the soil lab. 