Sunday, April 28, 2013

Week 4


  • This week we began construction of our final filter design
  • We decided on using a regular soda bottle to form the outside of the filter
  • The building of the filter: (collaborated by all group members on 4/28)
    • The helix was built out of plastic film that had to be hand cut and measured to make it fit and be water-tight. This was difficult to build and cut with scissors.
    • The plastic helix had to be epoxied to the center pole 
    • This then will dry and be put in the bottle
    • Josh and Laura cut plastic
    • Steve and Joe added helices to bottle 
    • Picture of construction:


  • The first part (helix) of the filter. We have to wait for this to dry and then we can put it in the soda bottle in 2 days.



  • We finalized our Gantt chart and are tracking our weekly progress. Below is the chart (by Steven Guarneri):

No comments:

Post a Comment